Featured Project Project

MATESS for Commissioning Tests (Energization High Voltage Lines)​​

MBESS Size 30 Ft Trailer / MATESS (1 MW / 2 MWh)

Innoversa deployed MATESS to support high-voltage line commissioning by replacing multiple conventional testing assets with a single, clean, and flexible mobile energy storage solution.

Key Use Cases:​

  • Reducing the number of rental units required for testing by consolidating functions into a single MBESS.​
  • Performing comprehensive commissioning tests including interconnection, production, load serving, ramp rate, islanding, capacity, and round-trip efficiency (RTE) tests.​
  • Delivering clean, quiet operation with no noise or emissions during testing activities.​
  • Replacing diesel generators and multiple types of load banks (resistive, inductive, capacitive).​
  • Providing precise and programmable power profiles to simulate real operating conditions.​
  • Enabling fast deployment and simplified setup for field testing environments.​

Customer Gain:​

  • Significant cost savings by eliminating multiple rental equipment and reducing fuel consumption.​
  • Streamlined testing process with a single, integrated solution.​
  • Improved testing accuracy with controlled and flexible power output.​
  • Enhanced safety and working conditions due to zero noise and emissions.​
  • Faster commissioning timelines with reduced logistical complexity.​
  • Reduced environmental impact compared to traditional diesel-based testing setups.

VIEW OUR OTHER FEATURED PROJECTS