Featured Project Project

Seasonal Excess Generation and Peak Load Management (Hosting Capacity Enhancement)​

MBESS 20 Ft Trailer / PROMIS (500 kW / 1 MWh)

Innoversa deployed PROMIS to enhance feeder hosting capacity and manage both excess generation and peak demand, enabling more efficient utilization of distributed energy resources while maintaining grid stability.​

Key Use Cases:​

  • Maximizing PV production value by avoiding curtailment and enabling energy shifting to increase overall revenue.​
  • Providing feeder voltage support by absorbing reactive power during high PV generation periods and injecting reactive power during peak demand.​
  • Enhancing hosting capacity without requiring permanent grid upgrades.​
  • Enabling flexible peak shaving with scheduled discharge (5 PM – 7 PM).​
  • Allowing dynamic adjustment of peak shaving timing based on feeder conditions or control center signals.​
  • Supporting grid stability through coordinated active (P) and reactive (Q) power control.​

Customer Gain:​

  • Increased utilization and revenue from existing PV assets by minimizing curtailment.​
  • Improved feeder voltage stability and overall power quality.​
  • Deferred or avoided infrastructure upgrade costs.​
  • Enhanced operational flexibility with dynamic control capabilities.​
  • Reliable peak load management during critical periods.​
  • Scalable and repeatable solution for seasonal and temporary grid constraints.​

VIEW OUR OTHER FEATURED PROJECTS